6 a.m. - the metro starts working on all days of the week except Friday
6-8 minutes - interval of trains of the "green" metro line
7 - the total number of zones into which the metro is divided
10-15 meters - the height of most of the route of both metro lines
11.6 Dirhams (US $ 3.1) - maximum metro fare 1 time
14 trains serve the green line during peak hours, at off-peak times - 10 trains
18 - the total number of stations of the green metro line
20 seconds - waiting period for trains at the stations of the red metro line
29 - the total number of stations of the "red" metro line
47 - the total number of pedestrian crossings on the "red" and "green" metro lines
50 - the total number of trains moving on both lines during peak hours, 28 - at off-peak times
52.9 km - the length of the red metro line
60-63 minutes travel between the two terminal stations of the red line metro
80 fils (20 cents) - metro fare 1 time
110 km / h - the average speed of the metro trains, excluding stopping times
500 buses serve the red metro line
500 meters - the maximum distance between the metro station and its bus
660 police officers of various ranks ensure the safety of metro passengers
787 buses serve both metro lines
3,000 surveillance cameras installed at stations, in transitions and subway tunnels
116,340 - average daily number of passengers using the metro in June 2010
130 529 - a record number of people using the metro on July 1, 2010
2,000,000 - average monthly number of passengers served by the subway
3 301 959 - a record number of passengers using the metro in August 2010
7.8 billion US dollars - the cost of building the subway